Secured Landfill Facility (SLF)

The establishment of Common Secured Landfill Facility became necessary to facilitate disposal of solid waste being generated by industrial units in an environmentally safe manner. This was also necessary to fulfill the requirement of the provisions of Hazardous Waste (Management and Handling) Rules 1989 framed under Environment (Protection) Act 1986. Keeping these requirements in mind the Green Environment Services Co-operative Society Limited (GESCSL) initially formed a separate body named Gujarat Industrial Waste Management Company Limited (GIWMCL) in 1996 to look after this responsibility.  Later in 1998 this body was merged with GESCSL for better and smooth functioning in respect of administration of all types of common infrastructure for the protection of environmental quality in this area.

Nature of Solid Wastes:

The solid wastes generated by the industrial units in Vatva industrial estate mainly consist of Gypsum, Iron Sludge, ETP Sludge, Incinerator Ash, Reject / Off specification Materials etc.  Proper interim storage facilities were to be provided by individual industrial units in its premises for the storage of solid waste for a brief period until it is picked up and transported to SLF.  The total quantity of solid waste generated in the estate was estimated to be 70000 MT.

SLF Details:

Initially SLF No. 1 & SLF No. 2 were constructed. Later these two sites were expanded and after full capacity utilization were capped and green vegetal layer was developed.

The relevant details are given below…

SR. NO.

PARTICULARS

SLF – 1

SLF  – 2

EXPANSION OF SLFs 1 & 2

1

Development Stage

Phase: 1

Phase: 2

Phase: 3

2

Capacity

74287 MT

170004 MT

128441 MT

3

Period of Operation

April 1998 to January 1999

February 1999 to October 2001

October 2001 to February 2003

4

Total Cost (Rs. in Crore)

0.93

1.66

0.81

A new Cell (SLF No. 3) was constructed and was put on use in March 2003. Currently this cell is in operation.

The relevant particulars are as under…

SR. NO.

PARTICULARS

SLF  – 3

1

Development Stage

Phase: 4

2

Capacity

750000 MT

3

Commencement of Operation

March 2003

4

Quantity of Solid Waste Dumped as on May 31, 2011

586117.150 MT

5

Total Cost (Rs. in Crore)

11.10

Environmental Monitoring:

We have set up a full flagged Analytical Laboratory equipped with necessary analytical instruments and facilities. Qualified and trained personnel look after the operation of SLF and laboratory.

The monitoring includes the followings…

  • Analysis of solid waste received at SLF and leachate.
  • Ambient Air Quality Monitoring
  • Monitoring of Ground Water Quality

The records of all of the above results are maintained and are made available to the concerned authorities whenever required.

SUMMARY

SR. NO.

YEAR

ACTIVITY

INVESTMENT

Rs. IN CRORE

QUALITY OF EFFLUENT AT CETP OUTLET

REMARKS

COD mg/l

BOD mg/l

CETP UP-GRADATION

1

1998

CETP constructed and commissioned initially

45.02

1800-2000

150-200

 

2

2007

Phase: I

06.70

1000-1200

80-120

 

3

2009

Phase: II

22.69

800-1000

40-60

Electro-oxidation is yet under stabilization.

4

2010

Phase: II

250

30

Expected after stabilization of Electro-oxidation

5

2010

Clariflocculator

02.00

    Proposed
Additional Aeration Tank

08.00

Total Investment as of December 31, 2009     :         Rs. 74.41 crore.Additional (proposed) in 2010                         :        Rs. 10.00 crore.

 

SECURED LANDFILL FACILITY

1

1998

SLF No. 1

00.93

Capacity:   74287 MT Filled, capped and Vegetal layer developed

2

1999

SLF No. 2

01.66

Capacity: 170004 MT

3

2001

Expansion of SLFs 1 & 2

00.81

Capacity: 128441 MT

4

2003

SLF No. 3

11.10

Capacity : 675000 MT In operation… Quantity of Solid waste dumped as on

31-12-2009: 586117 MT

 

GRAND TOTAL  :  88.91 CRORE